Power

Power block on FEDv1 Documentation | Change list (09.07.02) | Timing | Fault Finding instructions (25.03.03)

De-coupling scheme (17.07.02)

Power Distribution diagram (27.02.2002)

Power start up timings (scope plots, 29.05.2003) :  3.3V * (with CFlash) ; 3.3V * (without CFlash) ; 5V  

(* before DCI disabled in Delay FPGA) 

 

Prototype VME Crate Requirements List (08.11.2002)

FED power estimates & measurements spreadsheet (RAL) (updated 07.01.2004)

FED Power version2 summary (Imperial) (01.04.2004)

FED Crate Power Final Requirements Table (13.05.2004)

 

Temperature

Imperial tests with 3 FEDs results (Greg)  ; Comparison with RAL measurements (Greg)

RAL tests with 5 FEDs results ; crate pictures

Greg's last word on temperatures : plot & email

Full 16 FEDs in Crate Temperatures before water cooling (from Ivan)


Back to Project Documentation